March 2011. To the hanger - wings on!
I had planned to move my Great Lakes to the hanger the first weekend in March. David and James came over to help load up. I had planned to take the wing racks with me but David suggested we just put the wings straight on. So by the end of the day my Great lakes was at the hanger with wings on. The propellar (I had to have the propellar overhauled - replacing the hub) was fitted a week later along with the tail surfaces.


Lycombing Engine Baffles
..
..
..
..
..
  Copyright © 2010 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.