My Great Lakes 2T-1A-2 Rebuild Diary 2010.

October 2010. painting, controls, brakes and engine mount.
Lots of adhoc jobs this month, firewall, started on new baffles. Fitted the engine mount, and a GPS mount in the cockpit. Alsong with lots of work on the wiring.


I stripped and rebuilt controls.
Lycombing Engine Baffles
Brake reservoir mounted on the rear of the front seat.
..
..
..
GPS mount and new XCOM 760 radio
..
..
..
..
..
Engine mount refitted. I have had it crack tested and repainted.
Upper engine mount.
Lower engine mount.
Unpacked the seat belts, they were then cleaned. Came up like new!
  Copyright © 2010 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.