My Great Lakes 2T-1A-2 Rebuild Diary 2010.

February/March - 2010. Electrics.
I scrapped all the wiring and have completely re-wired my Lakes. I have added an XCOM-760 to the instrument panel, and added power for a GPS and smoke system.


The stick grips need to be properly secured, so I fitted a nut plate.
Wooden stick grip fitted.
The front stick needed to be shortened by 1" as the wood stick grip is taller by 1". If left it made the top if the grip come into contact with the fuel tank in the front cockpit.
  Copyright © 2010 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.