My Great Lakes 2T-1A-2 Rebuild Diary 2008.

17-Nov-2008. Fabric covering.
Finished of covering the centre section and started the rudder. The rudder is the LAST PART to cover! That's it no more fabric covering..... just lots of spraying!


After ironing the fabric it is nice and taught.
I am pleased with the abric fitting, especially around the handle area where it is quite tricky.
The tank vent. This is where the fabric split originally and the entire bay was lost. So I have fitted a re-inforcement ring round it. Just to be sure!
Same with the fuel filler, I put a ring around it.
This is for the inspection panel.
Doped in place.
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.