My Great Lakes 2T-1A-2 Rebuild Diary 2008.

25-March-2008. Fabric covering L/H Upper wing.
This evening I continued fabric covering on L/H upper wing, fitted fabric to upper surface.


Fabric fitted to the upper surface of the L/H upper wing.
This has not been tensioned yet..
Planning ahead. Just checking what inspection panels go.
Glued the underside fabric.
Wing flipped over ready to glue underside fabric in place tomorrow evening.
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.