My Great Lakes 2T-1A-2 Rebuild Diary 2008.

11/14/15/16-July-2008. Fabric covering.
Finished r/h lower wing to silver and started work on the l/h lower wing. Fitted the lower and upper fabric.


r/h lower finished to silver.
Anti-chafe tape.
Lower fabric fitted.
Painted Rand-o-proof on the wing walk, this will then stick to the fabric when more rand-o-proff is applied to the fabric.
Fitting l/h lower wing upper fabric.
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.