My Great Lakes 2T-1A-2 Rebuild Diary 2008.
17-January-2008. Right hand lower wing.
Wing end.
|
|
I removed the last two ribs and wing end as one part from the old
spars. It went straight back on without any problems.
Wing end fitted.
|
|
After fitting all the rib bolts - not the rib screws top and bottom
of the spar - I tensioned the brace wires. Appart from the inboard bay
as I have not fitted the last rib yet. I will leave the wing over night
and recheck again tomorrow.
Refitted all the small leading edge ribs.
Fitted the pitot and static line. Wing is really taking shape now.
|
|
Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it. |