gapilot vans RV7 quick build kit
My Great Lakes 2T-1A-2 Rebuild Diary 2008.

29-February-2008. Right hand lower wing.
Back from my ski trip, and have finished my Vans RV7 permit renewal. So work restarts on the right hand lower wing. Some varnish work and started final refit of the leading edge.
It was nice to be back out in the workshop this evening.


Refitted Cherry rivets holding first rib to spar mount. This is the rear spar.
Rear spar again - thought I had taken a picture of the front spar.
I decided to fit the aileron to check that everything was in alignment. I then refitted the rear edge to upper part of wing.
Aileron fitted to check alignment.
Refitted the strobe and light cables.
Strobe and light cables.
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA(PFA), FAA or CAA. Please check all information is correct before you act upon it.