25-February-2008. Right hand lower wing.
Back from my ski trip, and have finished my Vans RV7 permit renewal. So work restarts on the right hand lower wing. Some varnish work and started final refit of the leading edge.
It was nice to be back out in the workshop this evening.


Brace bracket needs to be fitted before I finally fit the leading edge.
I varnished this area before fitting the leading edge.
Replacing the leading edge. I fitted clecos to every hole to ensure every thing aligned properly.

The leading edge skin is quite thick and takes a lot of bending. I had to cleco the underside in first as its not possible to pull the small edge around.
Fitting the rivets from the leading edge first .
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA(PFA), FAA or CAA. Please check all information is correct before you act upon it.