My Great Lakes 2T-1A-2 Rebuild Diary 2008.

21 to 31-Jul-2008. Fabric covering.
Finished fitting fabric to l/h lower wing. While dope was drying I turned over fuse and started to plan fabric work - using old lower fabric as an example.


Fitting fabric around fittings on l/h lower wing.
Cutting fabric around aileron bay.
Me with an iron again!
Tensioning the fabric.
I fitted all these rivets with a hand rivet puller in one evening... hard work!
Wing mount inspection panel fitting.
Fabric'ed over.
While the dop is drying I decided to turn fuse over and start planning the fabric for the underside.
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.