My Great Lakes 2T-1A-2 Rebuild Diary 2008.

01-April-2008. Fabric covering inspection panels.
This evening fitted fabric inspection panel attachments to L/H upper wing and started making them for R/H upper wing.


Rear wing root underside inspection and spar bolt panel.
Front underside spar fixing panel. I have put two layers of fabric over the cover fabric attachment.
Forward mid upper. Again I put two layers of fabric over the panel attachment. I also covered the area around the interplane strut.
Started work on the R/H wing inspection panels. The panel attachment is under the panel being glued to the fabric.
Front one needs some trimming and attching to fabric.
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.