gapilot vans RV7 quick build kit
My Great Lakes 2T-1A-2 Rebuild Diary 2007.

26/7-September-2007. Covering R/H Horizontal stabiliser, ironing elevators and horizontal statilisers. Started dopeing the elevators.

I have also created a HELP ME page on this site for areas/parts etc that I don't know what fits. Please have a look especially if you have a Great Lakes 2T-1A-2.
Here is this evenings progress:

I am wrapping the fabric around the trailing edge on the HS and fixinf on the leading edge.
One side fixed to leading edge.
L/H stabiliser ironed.
R/H stabiliser finished ready for iron.
Me ironing an elevator.
Busted, will I now have to iron my own shirts?!?!
Time to apply the first coat of RAND-O-PROOF
The runs are on the inside and show the rand-o-proof has gone through the surface.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.