![]() |
![]() |
My Great Lakes 2T-1A-2 Rebuild Diary 2007. 19-September-2007. Started covering the control
surfaces. David came over to give me a lesson on fabric covering -
he is building a Great Lakes. His instruction has really made a difference,
it's okay reading a manual or viewing a video. But having David keeping
an eye on what I was doing and offering advise as I went along has
made all the difference. He has saved me days, if not weeks or months
of progress having set me off on the correct path from the start.
Davids inspector is the same as mine so he knows what he is looking
for and will be checking.
I have also created a HELP ME page on this site for areas/parts etc that I don't know what fits. Please have a look especially if you have a Great Lakes 2T-1A-2. Here is this evenings progress: ![]() |
|
![]() ![]() |
|
![]() ![]() ![]() ![]() |
|
![]() ![]() ![]() ![]() ![]() |
|
Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it. |