![]() |
![]() |
My Great Lakes 2T-1A-2 Rebuild Diary 2007. 08/09-October-2007. My control surfaces need to be inspected,
so I have started work on the centre section. I am replacing the
rear spar and all the ribs. Every one of the original ribs was cracked/scrap. ![]() |
|
![]() ![]() |
|
![]() ![]() ![]() ![]() |
|
Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it. |