My Great Lakes 2T-1A-2 Rebuild Diary 2007.

06/07-November-2007. Working on the centre section. Checked alignment of flying wires and bonded on the centre section panel.


Here is this evenings progress:


I am ready to fit the lower section panel. Before fitting the panel I have fitted the flying wires to check the clearance..
The flying wire just clears the panel. But this could be a problem with clearance when the fabric is in place and the cover fitted. The pencil area in the picture is the area cut out in the fabric - from the fabric removed.
Obviously I have to take into acount the previous fabric cut-out, but I don't want excessive sized holes. Having examined some other GL's (the ones at Chandler) I have increased the size on the ply but not quite as big as the previous fabric.
All ready to bond on the ply. It has taken a while to bond the spacers to the spars as I didn't have many clamps so did them in stages. I bonded the ply in place and fitted some brass screws - battery's went flat on the camera! Will post some pictures later.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.