![]() |
![]() |
My Great Lakes 2T-1A-2 Rebuild Diary 2007.
27/28/29-December-2007. While waiting for some parts to
arrive I had a look at the R/H upper wing. It has been inspected
by my inspector and the spars are okay. The wing just needs some
small items replaced and refurbished. Cleaned and revarnish.
I also decided to fit the L/H upper wing to the centre section. I had removed the inner rib and I want to ensure it alignes with the centre section properly. ![]() |
|
![]() ![]() ![]() |
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
Copyright © 2007, 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it. |