gapilot vans RV7 quick build kit
My Great Lakes 2T-1A-2 Rebuild Diary 2007.

12/14/15-December-2007. Still very cold outside so I have just done a couple of hours in he evenings, and Saturday afternoon. Continued progress with the L/H Upper wing. I have set/tensioned the drag & anti-drag wires and checked alignment. Finished glue fitting on the centre wood brace and wood parts on rear spar to trailing edge.


Here is todays progress:


Now I have set the drag & anti-drag I am gluing the wood brace in position.
Brace in position.
Lots of small parts needed to be glued to the spar.
Now I have set/tensioned the drag & anti-drag wires I refitted the trailing edge to check alignment.
I bolted the ribs in place but did not fit the rib screws until I set the drag & antidrag wires.
I will remove the trailing edge varnish the wing parts.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.