gapilot vans RV7 quick build kit
My Great Lakes 2T-1A-2 Rebuild Diary 2007.

10/12-December-2007. Not long in the workshop in the evenings as it's below zero outside.


Here is todays progress:


Centre spar brace bracket.
The front spar has been replaced. I just tidied it up a little.
I have made new parts rather than refit the old ones.
Wooden centre brace - cleaned at the ends ready to re-glue back in place.
Small filler under spar (spar upside down) between bracket.
Cleaned up and re-varnished.
Wooden centre brace fits here.
I refitted leading edge to check alignment.
This end rib needs to be tidied up a little before riveting into place.
The end brace is back in position.
Spar end..
Trailing edge fitted in place.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.