01/02-December-2007. I need to get the wings and centre section inspected. So I decide to do some work on the fuse. Some of the stringers needed to be replaced, so I made some new ones.


Here is weekends progress:


All of the lower stringers need to be remade.
I cut the replacements and held them in place with tie wraps to check the fitment.
The underside stringers.
Rear end of the lower stringers.
Forward end of the top stringers. The center one was damaged during shipping so I replaced it.
I have to rebuild the port side stringgers.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.